Project Details
The office of this building is constructed of pre-cast concrete while the distribution area and maintenance shop are pre-engineered steel buildings. The facility is located in Green, OH and was a 35 acre development. The new center increases efficiency through the 86 dock doors on the building and the site developments allowing for smoother traffic flow and greater efficiency moving products.
Size: 51,178 SF