Project Details
A 24,000 square foot metal building connected an existing CECO structure, aligning perfectly to facilitate a long crane runway extending between the two structures. The second addition included a pond relocation and expansion of parking areas. Both projects required great attention to detail, strict adherence to schedules, and were completed without obstructing the active operation of the business.
Project 1
- Size: 24,000 sf
Project 2
- Size: 54,000